Order winMajor development· Adverse for the businessFiled on BSE ·

BHEL withdraws acceptance of MB Power LOI for 1x800 MW Anuppur Thermal Power Project

Bharat Heavy Electricals · Electrical Equipment

Arthneeti Research DeskPublished 1 min read

Key highlights

  • BHEL had accepted a Letter of Intent from MB Power (Madhya Pradesh) Limited for supply of equipment (Boiler, Turbine, Generator) for the 1x800 MW Anuppur Thermal Power Project.
  • The LOI was subject to execution of a formal contract within the agreed timeline; despite multiple discussions and extensions, the contract could not be executed.
  • BHEL's acceptance of the LOI dated 03.09.2025 stands withdrawn; BHEL informed the customer of the withdrawal at 1636 hrs on 17.04.2026.

Why it's rated major development: order cancellation is always high

Figures checked against the filing by a second AI read, which corrected the first summary. About the business, not the share price.

Original filing

Withdrawal Of BHEL's Acceptance To Letter Of Intent From MB Power (Madhya Pradesh) Limited

Read the filing on BSE (PDF) →

Companies guiding to strong growth

Ranked by management's own guidance on revenue and margins — not by us.

Rossell Techsys

Aerospace & Defense

Revenue growth 40%+Margin up 2%+

Sign up free to see all 6 →

See full rankings

Rank buckets describe management commentary on revenue and margin. Not investment advice, and not a forecast of returns.

More from Bharat Heavy Electricals

Other order win filings this fortnight

All order win filings →

Summary written by Arthneeti from the company's filing with the stock exchange; check the original filing for full details. Arthneeti is a research and analytics platform, not a SEBI-registered investment adviser, and nothing here is a recommendation to buy or sell.