Capex / expansionNotableFiled on BSE ·

ACME Solar commissions 240.720 MWh Battery Energy Storage System project

ACME Solar Holdings · Power

Arthneeti Research DeskPublished 1 min read

Key highlights

  • Commissioned 240.720 MWh BESS project at Sanwara and Mehar Nagar, Rajasthan on June 30, 2026
  • Commercial operation date set for July 02, 2026
  • ACME Suryodaya Private Limited's total commissioned capacity reaches 285 MW / 842.624 MWh

Why it's rated notable: The filing states no rupee value, so the level rests on the commissioning of 240.720 MWh of BESS capacity, bringing the subsidiary's total to 842.624 MWh, with COD on July 02, 2026.

Original filing

Update On Commissioning Of Battery Energy Storage System (BESS) Project

Read the filing on BSE (PDF) →

Companies guiding to strong growth

Ranked by management's own guidance on revenue and margins — not by us.

Rossell Techsys

Aerospace & Defense

Revenue growth 40%+Margin up 2%+

Sign up free to see all 6 →

See full rankings

Rank buckets describe management commentary on revenue and margin. Not investment advice, and not a forecast of returns.

More from ACME Solar Holdings

Other capex / expansion filings this fortnight

All capex / expansion filings →

Summary written by Arthneeti from the company's filing with the stock exchange; check the original filing for full details. Arthneeti is a research and analytics platform, not a SEBI-registered investment adviser, and nothing here is a recommendation to buy or sell.